If something like this has ever happened to you: When the hoisted load is lowered, the bottom block drifts when you let go of the button on the pushbutton control. what could be the cause?
- Crane Operator test questions and answers
- Crane operator interview questions and answers
- Rigging test questions and answers
Overhead crane operator test questions and answers
The following practice questions are representative of a level-1 mobile crane theory exam. These will give you a good idea of how the questions are worded and structured.
What does the hand signal indicate in the figure below?
- Boom up (*)
- Hoist up
- Load up
- Hold the swing
What is the radio protocol between a mobile piece of equipment and a tower crane sharing the same workplace?
- Mobile operator uses the site channel
- A separate radio with a mobile to tower crane frequency (*)
- Mobile rigger maintains radio contact with tower crane rigger
- Mobile operator switches to tower crane frequency once on site
What is the equivalent of 10,030 pounds in kilograms?
- 3,057 kg
- 3,238 kg
- 4,554 kg (*)
- 7,650 kg
Crane operator test questions and answers pdf
These sample questions are intended to convey something of the style and content of the National Operator Certification Program examination developed and administered by the National Commission for the Certification of Crane Operators.
They are not actual test questions, nor do they attempt to address all of the areas of knowledge tested on the CCO certification examination. Response to these questions is not necessarily an indication of performance on the CCO examinations.
What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his thumb up?
- Boom down
- Swing
- Boom up
- Telescope out
The load line of the crane you’re operating comes into contact with an energized power line. There’s no sign of any other danger, such as fire. In such a situation, you should:
- Climb down carefully from the crane cab
- Jump down, feet together
- Stay in the cab until the lines are de-energized
- Get as far away from the crane as possible
Unless the manufacturer states otherwise, the net capacity of a crane on main boom is the capacity listed in the load chart:
- minus the weight of the rigging and all attachments
- plus the weight of the rigging and all attachments
- minus the weight of the rigging and all attachments not in use
- minus the weight of the rigging alone
Unless the operator takes account of boom deflection, when lifted off the ground, a properly rigged load may:
- swing out away from the crane
- swing in towards the crane
- raise absolutely vertically
- shift in its rigging
NCCCO test questions and answers
While there are other companies seeking to certify crane operators, only one organization, the National Commission for the Certification of Crane Operators (NCCCO), provides CCO certification.
Tips for Passing the NCCCO Exams
Take a preparatory class. Training is the key to passing. You may think you know everything about cranes, but how well do you know OSHA and ANSI/ASME rules, regulations and industry best practices? A preparatory class builds confidence so you won’t be intimidated by the test.
Read the Candidate Handbook. The manuals tell you everything you need to know about the NCCCO exams, from start to finish. Focus on the outline of the written exams, the outline is like the “blueprint” for the exams.
Forget how you do it daily. You may be doing it safely, but are you following the rules, manufacturer recommendations, and industry best practices? Come to class with an open mind. In fact, you may learn something you didn’t know before.
Exams require experience. The Candidate Handbook states: “CCO certification exams are designed for operators who are trained and currently working in crane operations.” If you are inexperienced, you will need extensive training to get to that level. You can’t get lucky on this test.
Study the load tables. One of the most important parts of this test is being able to solve a load graph problem. If you take a CCO Prep training class, you will be provided with a sample problems and loading diagrams.
Crane operator practice test
NCCCO test questions and answers:
This mobile crane preparation certification study manual is all you need to prepare to take the certification exams for all types of mobile cranes without wasting your time.
It includes selected information to help make sure you learn exactly what you need and avoid all the clutter. Includes 5 valuable prep tests (with answer keys) for you:
- General knowledge test (100 questions)
- Technical knowledge test (66 questions)
- Site-Specific Test (42 Questions)
- Crane Load Chart Test (49 questions) and
- Practical evaluation test form for your practical operational use.
A free mobile crane inspection checklist is also provided for your use.
EOT Crane Questions and Answers
The operator’s job is to operate bridge cranes for the safe transfer of raw materials, intermediate products, and finished products within the plant.
Overhead crane manufacturers in the USA